← Back to selection YOUR PROJECT DATA · FULL PALLETS

Your project data.

35 questions in 5 steps — layout, finished product, raw materials, flows, trucks. Every question has a "to be confirmed" option if you don't have an exact answer right now. Progress saves automatically: you can close the page and come back anytime.

Step 1 of 5 20%
1. AutoCAD layout or facility plan
Explanation: A plan of the area where the system will be integrated — clearly showing the operating zone, production lines, warehouse, and loading docks. DWG/PDF preferred. Choose the option that fits you:
We accept PDF, PNG, JPG, DWG. Max ~5 MB per file. For larger files, use the "Link" tab.
Paste an accessible link (Google Drive, Dropbox, WeTransfer, OneDrive).
2. Work schedule
Explanation: How many shifts, how many days per week. E.g.: "2 shifts × 5 days" or "3 shifts × 7 days (24/7)".
3. Temperature and humidity in the facility
Explanation: Key for selecting the right technologies (AGV batteries, sensor type, shuttle materials).
4. ERP system used
Explanation: The system the orchestration layer (WMS/WCS) integrates with for orders and inventory.

Progress saves automatically. You can close the window and come back anytime.